​Yarra Valley Water Silvan Building

​Works completed for ADCO Constructions Pty Ltd in 2012

Rayner Electrical was engaged by ADCO Constructions to undertake the extension of the Yellingbo Office, this project required Rayner to supply and install all the electrical, automation and data components to full fill the client requirements.

A new main switchboard was installed to supply the sites power requirements, and 5 other sub-boards were installed throughout the new building to reticulate the cabling.  A new Cat6A integrated voice and data system was installed given the users greater flexibility. It comprises of a new communications rack fitted out with 24 port Krone Cat6A patch panels wired out to various locations across the site, the user has the option of installing a patch lead into a point and patching it at the communications rack to be either a data or phone point.  Fibre link cables were also installed to link up the existing buildings data systems to the new building.  

​A new lighting system was installed across the complex, controlled via a C-Bus system including motion sensors, local switches and a touch screen installed at the entrance of the building.